Thursday, June 4, 2009

balloonsat module testing

Upon completing the balloonsat module we had to hook up the module to a power supply to check the voltages and resistances on several specific points on the module. To check the resistances of the balloonsat module we had to disconnect the module from the power supply, and connect the multi-meter to the specified checl points. To check the voltages of the ballonsat we had to reconnect the module to the power supply. Next we had to touch the multi-meter to the negative battery port on the module and the positive to the repective check point!
Fun right?!

1 comment: